submitted to collab file

This commit is contained in:
aj 2020-10-24 19:20:02 +01:00
parent 01a1a8085e
commit 63b7444b37
6 changed files with 836 additions and 74 deletions

2
.gitignore vendored
View File

@ -1,4 +1,4 @@
*~ *~*
*# *#
*.pdf *.pdf
*.eps *.eps

Binary file not shown.

BIN
inception/SeaDepth.png Normal file

Binary file not shown.

After

Width:  |  Height:  |  Size: 746 KiB

BIN
inception/planetsolar.jpg Normal file

Binary file not shown.

After

Width:  |  Height:  |  Size: 61 KiB

View File

@ -4,3 +4,121 @@
url = {https://www.gartner.com/en/information-technology/glossary/digitalization} url = {https://www.gartner.com/en/information-technology/glossary/digitalization}
} }
@misc{planetsolar,
author = {Jenny Filippetti},
month = jul,
title = {PlanetSolar: the first solar powered boat around the world},
url = {https://www.designboom.com/technology/planetsolar-the-first-solar-powered-boat-around-the-world},
year = {2012}
}
@misc{Radar,
author = {Shilavadra Bhattacharjee},
month = apr,
title = {Marine Radars and Their Use in the Shipping Industry},
url = {https://www.marineinsight.com/marine-navigation/marine-radars-and-their-use-in-the-shipping-industry},
year = {2020}
}
@book{sonar-slam,
author = {David Ribas and Pere Ridao and Jos{\'e} Neira},
doi = {10.1007/978-3-642-14040-2},
edition = 1,
isbn = {978-3-642-14039-6},
issn = {1610-7438},
month = jan,
publisher = {Springer-Verlag Berlin Heidelberg},
title = {Underwater SLAM for Structured Environments Using an Imaging Sonar},
year = {2010}
}
@misc{maritime-autonomy.vs.autpilot,
author = {{Sea Machines}},
month = jan,
title = {Marine Autonomy vs. Autopilot: Know the Differences},
url = {https://www.maritime-executive.com/features/marine-autonomy-vs-autopilot-know-the-differences-1},
year = {2020}
}
@article{unmanned-slam,
author = {Prof R Sutton and Dr S Sharma and Dr T Xao},
doi = {10.1080/20464177.2011.11020248},
eprint = { https://doi.org/10.1080/20464177.2011.11020248 },
journal = {Journal of Marine Engineering \& Technology},
number = {3},
pages = {3--20},
publisher = {Taylor \& Francis},
title = {Adaptive navigation systems for an unmanned surface vehicle},
url = {https://doi.org/10.1080/20464177.2011.11020248},
volume = {10},
year = {2011}
}
@misc{dyn-pos,
author = {{Nautical Institute}},
title = {Dynamic Positioning},
url = {https://www.nautinst.org/resource-library/technical-library/dynamic-positioning.html}
}
@misc{dnv-dp,
author = {{DNV GL}},
month = jul,
title = {Dynamic positioning vessel design philosophy guidelines},
url = {https://rules.dnvgl.com/docs/pdf/DNVGL/RP/2015-07/DNVGL-RP-E306.pdf},
year = {2015}
}
@misc{offshore-dp,
author = {{Offshore Engineering}},
title = {Dynamic Positioning Classes - Redundancy Levels},
url = {https://www.offshoreengineering.com/education/dynamic-positioning-dp/dnv-dp-classes-redundancy}
}
@misc{icom-radio,
author = {{ICOM}},
title = {A Guide to Marine Radio},
url = {https://icomuk.co.uk/A-Guide-to-Marine-Radio/3995/169}
}
@misc{yachtcom-vhf,
author = {YachtCom},
title = {Marine VHF Radio},
url = {http://www.yachtcom.co.uk/comms/vhf}
}
@misc{yachtcom-requirements,
author = {YachtCom},
title = {Marine Radio Legal Requirements},
url = {http://www.yachtcom.co.uk/comms/home2020.html}
}
@misc{marininsight-ais,
author = {Shilavadra Bhattacharjee},
month = nov,
title = {Automatic Identification System (AIS): Integrating and Identifying Marine Communication Channels},
url = {https://www.marineinsight.com/marine-navigation/automatic-identification-system-ais-integrating-and-identifying-marine-communication-channels},
year = {2019}
}
@article{digisat,
author = {Digisat},
title = {Maritime Internet Service},
url = {https://www.digisat.org/maritime-satellite-internet}
}
@misc{deccan-repair,
author = {Francis D'Sa},
month = dec,
title = {How undersea fibre-optic cables are repaired},
url = {https://www.deccanchronicle.com/technology/in-other-news/161216/how-undersea-fibre-optic-cables-are-repaired.html},
year = {2016}
}
@misc{subcom-anim,
author = {Subcom},
month = jan,
title = {Repair Animation - Undersea Fiber Optic Cable System},
url = {https://www.youtube.com/watch?v=r3tPI0qbLaE},
year = {2019}
}

View File

@ -32,7 +32,7 @@ figs-within-sections
\graphics default \graphics default
\default_output_format default \default_output_format default
\output_sync 0 \output_sync 0
\bibtex_command biber \bibtex_command default
\index_command default \index_command default
\paperfontsize 11 \paperfontsize 11
\spacing other 1.5 \spacing other 1.5
@ -164,36 +164,120 @@ y focusing on two specifications, that of net-zero carbon operations and
Investigations were made into fully renewable electricity generation for Investigations were made into fully renewable electricity generation for
the purpose of propulsion without chemical fuels. the purpose of propulsion without chemical fuels.
The main form of renewable electricity to have maritime applications would The main form of renewable electricity to have maritime applications would
be solar. be solar, methods such as hydroelectric generators and wind turbines would
drastically affect the aero and hydrodynamics of the craft and fail to
produce more power than being lost via this drag.
\end_layout
\begin_layout Subsubsection
Solar
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
Solar-powered ships have been commercially available for around 30 years Solar-powered ships have been commercially available for around 30 years
however they are typically not of the same form factor as that being pursued however they are not of the same form factor as that being pursued here,
here, tending towards smaller ferries and river or canal settings as opposed tending towards smaller ferries and river or canal settings as opposed
to sea-faring industrial vessels. to sea-faring industrial vessels.
Currently, the largest completely solar-powered ship is the Swiss Currently, the largest completely solar-powered ship is the Swiss
\noun on \noun on
Tûranor PlanetSolar Tûranor PlanetSolar
\noun default \noun default
, the first solar electric ship to circumnavigate the globe. , the first solar electric ship to circumnavigate the globe
Standing at 30m long, the vessel is at least half the length of typical \begin_inset CommandInset ref
LatexCommand ref
reference "fig:The-Tûranor-PlanetSolar"
plural "false"
caps "false"
noprefix "false"
\end_inset
.
Standing at 30m long, the vessel is less than half the length of typical
cable ships, it is not an industrial craft and was instead designed as cable ships, it is not an industrial craft and was instead designed as
a luxury yacht. a luxury yacht, see figure
\begin_inset CommandInset ref
LatexCommand ref
reference "fig:The-Tûranor-PlanetSolar"
plural "false"
caps "false"
noprefix "false"
\end_inset
.
The deck of the vessel is also almost entirely covered in solar cells, The deck of the vessel is also almost entirely covered in solar cells,
an impractical design point for an industrial ship. an impractical design point for an industrial ship.
\end_layout \end_layout
\begin_layout Standard
\begin_inset Float figure
wide false
sideways false
status open
\begin_layout Plain Layout
\noindent
\align center
\begin_inset Graphics
filename planetsolar.jpg
lyxscale 30
width 50col%
\end_inset
\end_layout
\begin_layout Plain Layout
\begin_inset Caption Standard
\begin_layout Plain Layout
The
\noun on
Tûranor PlanetSolar
\noun default
,
\begin_inset CommandInset citation
LatexCommand cite
key "planetsolar"
literal "false"
\end_inset
\begin_inset CommandInset label
LatexCommand label
name "fig:The-Tûranor-PlanetSolar"
\end_inset
\end_layout
\end_inset
\end_layout
\end_inset
\end_layout
\begin_layout Standard \begin_layout Standard
In order to evaluate the efficacy of a solar-powered propulsion system, In order to evaluate the efficacy of a solar-powered propulsion system,
estimations were made using the average deck area and propulsion power estimations were made using the average deck area and propulsion power
requirements of the existing fleet of cable laying and maintenance vehicles. requirements of the existing fleet of cable laying and maintenance vehicles.
A range of solar panels were included in an effort to find the highest A range of solar panels were included in an effort to find the highest
energy density possible. energy density possible.
\end_layout
\begin_layout Standard
Even with the generous and somewhat unrealistic assumptions that the panels Even with the generous and somewhat unrealistic assumptions that the panels
could produce their maximum rated power for 8 hours a day with 50% coverage could produce their maximum rated power for 8 hours a day with 50% coverage
of the deck, only 1% of the required power could be provided by the solar of the deck, only 1% of the required operating power could be provided
array, see appendix by the solar array, see appendix
\begin_inset CommandInset ref \begin_inset CommandInset ref
LatexCommand ref LatexCommand ref
reference "sec:Solar-Power-Estimations" reference "sec:Solar-Power-Estimations"
@ -204,9 +288,12 @@ noprefix "false"
\end_inset \end_inset
. .
Ultimately, a fully solar-powered industrial ship of scale being pursued This would also require that the the vessel only be mobile during the day,
in this project is not currently viable, despite solar being one of the a highly impractical restriction for a vessel.
most promising for such an application. Ultimately, a fully solar-powered industrial ship of the scale being pursued
in this project does not appear to currently be viable, despite solar being
one of the most promising renewable electric solution for such an application
in the future.
\end_layout \end_layout
\begin_layout Subsection \begin_layout Subsection
@ -214,7 +301,7 @@ Modular Propulsion
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
Some of the power generation methods discussed are not currently viable Some of the power generation methods being discussed are not currently viable
for the scale of vessel and endurance required. for the scale of vessel and endurance required.
Many are close to being viable and will soon allow net-zero carbon operations Many are close to being viable and will soon allow net-zero carbon operations
with the feasibility of current fossil fuel solutions. with the feasibility of current fossil fuel solutions.
@ -235,14 +322,14 @@ Generation
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
The generation stage of propulsion would include methods of generating electrici The generation stage of propulsion would comprise methods of generating
ty for the drive stage. electricity for the drive stage.
This would include the power generated by chemical fuels as described in This would include the power generated by chemical fuels as described in
section NICK-PROPULSION and any renewable energy contributing to the propulsion section NICK-PROPULSION and any renewable energy contributing to the propulsion
of the vessel. of the vessel.
Those systems not directly producing electrical power would include methods Those systems not directly producing electrical power would include methods
to transfer it, for example an alternator can be used to turn mechanical to transfer it, an alternator can be used to convert mechanical energy
energy from a combustion engine to AC current. from a combustion engine to electrical energy in the form of AC current.
\end_layout \end_layout
\begin_layout Subsubsection \begin_layout Subsubsection
@ -250,9 +337,9 @@ Drive
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
The drive section includes methods to store the energy from the generation The drive section would include methods to store the produced energy and
stage and the thrust mechanisms, be they water jets, propellors or an alternati the final thrust mechanisms, whether that be water jets, propellors or
ve. an alternative.
Although, in theory, the generation stage could be directly connected to Although, in theory, the generation stage could be directly connected to
the thrust methods, the inclusion of energy storage provides a buffer to the thrust methods, the inclusion of energy storage provides a buffer to
smooth power draw spikes. smooth power draw spikes.
@ -270,14 +357,27 @@ Onboard Operating Systems
To operate effectively at sea, the ship requires a number of systems to To operate effectively at sea, the ship requires a number of systems to
aid in navigation and control. aid in navigation and control.
Many of these are standard for marine operations, the scope of systems Many of these are standard for marine operations, the scope of systems
being used must be considered in order to estimate power usage, this will being used must be considered in order to estimate power usage.
have implications on the wider power systems including propulsion. Should a hybrid-electric propulsion including batteries be considered,
With part-electric propulsion including batteries, designs could include designs could include powering the onboard systems from this battery set
powering the onboard systems from this battery set or from a separate array. or from a separate array.
Additionally, final designs could generate power for these systems using Additionally, final designs could generate power for these systems using
onboard renewable energy such as solar power or from the combustion engines, onboard renewable energy such as solar power or from the generation stage
the use of renewables would be favoured in order to contribute to the goal of the propulsion system, the use of renewables would be favoured in order
of net-zero carbon operations. to contribute to the goal of net-zero carbon operations.
This would likely be more achievable than fully renewable electric propulsion
as the power draw could be orders of magnitude less than the average 9
MW being used by current cable ship propulsion (appendix
\begin_inset CommandInset ref
LatexCommand ref
reference "sec:Solar-Power-Estimations"
plural "false"
caps "false"
noprefix "false"
\end_inset
).
\end_layout \end_layout
\begin_layout Subsubsection \begin_layout Subsubsection
@ -289,7 +389,15 @@ The use of a maritime radar system is critical for safety when maneuvering
at-sea and close to shore. at-sea and close to shore.
By measuring the reflections of emitted microwave beams, possible collisions By measuring the reflections of emitted microwave beams, possible collisions
both static and mobile including other ships and land obstacles can be both static and mobile including other ships and land obstacles can be
identified and avoided. identified and avoided,
\begin_inset CommandInset citation
LatexCommand cite
key "Radar"
literal "false"
\end_inset
.
This allows safe movement even without any visibility. This allows safe movement even without any visibility.
\end_layout \end_layout
@ -298,7 +406,15 @@ A sonar system is also standard for maritime operations.
While radar provides mapping of obstacles at the surface, sonar typically While radar provides mapping of obstacles at the surface, sonar typically
maps below the water. maps below the water.
In its simplest form this provides depth information, more advanced systems In its simplest form this provides depth information, more advanced systems
can provide more extensive mapping of the surroundings. can provide more extensive mapping of the surroundings,
\begin_inset CommandInset citation
LatexCommand cite
key "sonar-slam"
literal "false"
\end_inset
.
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
@ -312,27 +428,44 @@ These systems will serve as inputs to the higher-level navigation systems
Originally designed merely to hold a course, autonomous piloting systems Originally designed merely to hold a course, autonomous piloting systems
are now capable of performing SLAM (Simultaneous localisation and mapping) are now capable of performing SLAM (Simultaneous localisation and mapping)
to construct an intelligent and dynamic course that will reroute around to construct an intelligent and dynamic course that will reroute around
objects, be they other ships or land masses. objects, be they other ships or land masses,
\begin_inset CommandInset citation
LatexCommand cite
key "sonar-slam,maritime-autonomy.vs.autpilot,unmanned-slam"
literal "false"
\end_inset
.
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
Dynamic positioning is in many ways similar to the more intelligent autonomous Dynamic positioning (DP) is in many ways similar to the more intelligent
systems described above. autonomous systems described above.
Originally used for offshore drilling operations, dynamic positioning systems Originally used for offshore drilling operations, dynamic positioning systems
are responsible for keeping a ship static, counteracting the moving ocean are responsible for keeping a ship static by using the propulsion systems
and wind. to counteract the moving ocean and incident wind force,
\begin_inset CommandInset citation
LatexCommand cite
key "dyn-pos"
literal "false"
\end_inset
.
Advanced systems provide reliability and redundancy likely beyond the requireme Advanced systems provide reliability and redundancy likely beyond the requireme
nts of this project, nts of this project, the DNV GL standard class 3 requires stability even
\end_layout during a complete burn fire subdivision or flooded watertight compartments
\begin_inset CommandInset citation
LatexCommand cite
key "dnv-dp,offshore-dp"
literal "false"
\begin_layout Quote \end_inset
Operations where loss of position keeping capability may cause fatal accidents,
or severe pollution or damage with major economic consequences.
\end_layout
\begin_layout Standard .
A suitable system for the repair operations taking into account it's capabilitie A suitable DP system for the cable repair operations taking into account
s and cost with be important during the design. it's capabilities and cost will be important during the design.
\end_layout \end_layout
\begin_layout Subsubsection \begin_layout Subsubsection
@ -342,21 +475,57 @@ Communications
\begin_layout Standard \begin_layout Standard
The ship will be fitted with a VHF (Very high frequency) radio system, standard The ship will be fitted with a VHF (Very high frequency) radio system, standard
for maritime ship-to-ship, ship-to-shore and possibly ship-to-air communication for maritime ship-to-ship, ship-to-shore and possibly ship-to-air communication
s. s,
With transmitters limited to 25 watts, the radio has a range of roughly \begin_inset CommandInset citation
100 kilometers which would not typically be useful for ship-to-mission LatexCommand cite
control communications, this use case would be provided by an internet key "icom-radio"
connection. literal "false"
\end_inset
.
The UK Maritime & Coastguard agency requires a radio along with a license
both for the ship and operator (
\begin_inset CommandInset citation
LatexCommand cite
key "yachtcom-requirements"
literal "false"
\end_inset
).
The radio has a range dependent on the height of the antenna, for an elevation
of 100m the radio should have a range of roughly 50 kilometers (
\begin_inset CommandInset citation
LatexCommand cite
key "yachtcom-vhf"
literal "false"
\end_inset
) which would not typically be useful for ship-to-mission control communications
, this use case would need to be provided by an internet connection.
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
Supplementing the collision avoidance provided by the radar system, the Supplementing the collision avoidance provided by the radar system, the
use of a VHF radio with AIS (Automatic identification system) capabilities use of a VHF radio with AIS (Automatic identification system) capabilities
provide additional information to passing ships. provide additional information to passing ships and vessel traffic services
Ships broadcast messages including a unique identifier, status (moving, (VTS).
anchored), speed and bearing. Ships broadcast messages including unique identifiers, status (moving,
anchored), speed and bearing among others,
\begin_inset CommandInset citation
LatexCommand cite
key "marininsight-ais"
literal "false"
\end_inset
.
Advanced systems can also relay information from other ships, creating Advanced systems can also relay information from other ships, creating
a mesh network. a mesh network.
This information is also used by the autonomous piloting system, allowing
coordination of vessel headings with the headings of surrounding vessels.
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
@ -364,7 +533,6 @@ The ship should have multiple gateways to the wider internet.
While berthed, the ship should be able to directly connect to the main While berthed, the ship should be able to directly connect to the main
depot, whether physically with an Ethernet cable alongside shore-power depot, whether physically with an Ethernet cable alongside shore-power
or via a high-strength wireless connection. or via a high-strength wireless connection.
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
@ -373,8 +541,18 @@ While at sea, the ship should be connected to the internet via a satellite
Satellite connectivity presents limited speed at a high price however it Satellite connectivity presents limited speed at a high price however it
is one of the only methods to ensure consistent connectivity throughout is one of the only methods to ensure consistent connectivity throughout
the ship's operating range. the ship's operating range.
With speeds typically below 1Mbps, specific QoS and flow controls would Although there are many different provider options, state of the art speeds
be necessary to prioritise mission critical traffic over user activity. can read 50/5 Mbps
\begin_inset CommandInset citation
LatexCommand cite
key "digisat"
literal "false"
\end_inset
.
With these speeds, specific QoS and flow controls could be used to prioritise
mission critical traffic over user activity.
\end_layout \end_layout
\begin_layout Subsubsection \begin_layout Subsubsection
@ -382,13 +560,171 @@ Auxiliary
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
Other, more boilerplate, systems should be also included. Other, more boilerplate, systems should also be included.
This would include onboard lighting, both internal and external and an This would include onboard lighting, both internal and external and an
audio system for tannoy broadcasts. audio system for tannoy broadcasts.
\end_layout \end_layout
\begin_layout Subsection \begin_layout Subsection
Mission Ops - ROV Mission Operations
\end_layout
\begin_layout Standard
Faults in sub-sea cables or their signal repeaters are generally repaired
by raising the length of affected cable up to the stern of ship, splicing
in a new section of cable or repairing/replacing the repeater and then
re-situating the cable on the seabed,
\begin_inset CommandInset citation
LatexCommand cite
key "deccan-repair,subcom-anim"
literal "false"
\end_inset
.
\end_layout
\begin_layout Standard
This project is not focused on the specific act of repair as this is the
responsibility of specialist crew members, instead the focus is on the
process of slicing and raising the cable to the vessel.
There are generally two methods for completing this slicing/raising process,
using grapnels or a remotely operated underwater vehicle (ROV).
\end_layout
\begin_layout Subsubsection
Grapnels
\end_layout
\begin_layout Standard
Grapnels are tools attached to an anchor chain that trail the stern of the
ship along the seabed.
The aforementioned slicing and gripping for retrieval is completed by two
different grapnels and requires repeated motions of the vessel perpendicular
to the cable in order to intersect it,
\begin_inset CommandInset citation
LatexCommand cite
key "subcom-anim"
literal "false"
\end_inset
.
\end_layout
\begin_layout Standard
The disadvantage of this method is the need for repeated motions of the
vessel and the lack of fine control over the grapnels.
\end_layout
\begin_layout Subsubsection
ROV
\end_layout
\begin_layout Standard
ROVs are submersible robotic devices used to complete remote work at sea.
The wide range of applications have led to many form factors of vehicle
from
\emph on
micro
\emph default
and
\emph on
observation
\emph default
ROVs for inspection and data collection in shallow water to larger
\emph on
work
\emph default
class vehicles responsible for deep water operations such oil drilling
or cable laying.
The use of a remote-controllable device allows the ship to remain static
as the ROV can complete both cutting and gripping motions in-place.
\end_layout
\begin_layout Standard
This reduces the movement required by the vessel and allows finer control
over the manual grapnel method.
This, along with the ability to see what is happening at the actuators
using onboard cameras would likely make these operations faster and more
accurate.
\end_layout
\begin_layout Standard
A disadvantage to using an ROV is the depth to which it is rated.
ROVs have a maximum operating depth due to the increasing pressure of the
sea, the
\noun on
ROV Subastian
\noun default
has a maximum working depth of 4,500m for example.
Once an operating range is defined for the ship, much of this could include
areas of sea floor that require a heavier duty ROV, see figure
\begin_inset CommandInset ref
LatexCommand ref
reference "fig:Sea-depth"
plural "false"
caps "false"
noprefix "false"
\end_inset
.
As such, a balance must be found between an ROV that will be useful throughout
a suitable operating area without being over-engineered, possible incurring
higher initial and maintenance costs.
\end_layout
\begin_layout Standard
\begin_inset Float figure
wide false
sideways false
status open
\begin_layout Plain Layout
\noindent
\align center
\begin_inset Graphics
filename SeaDepth.png
lyxscale 30
width 75col%
\end_inset
\end_layout
\begin_layout Plain Layout
\begin_inset Caption Standard
\begin_layout Plain Layout
The depth of the sea floor surrounding western Europe, darker regions indicate
deeper waters
\begin_inset CommandInset label
LatexCommand label
name "fig:Sea-depth"
\end_inset
\end_layout
\end_inset
\end_layout
\end_inset
\end_layout
\begin_layout Standard
One method to achieve this balance would be to have the capability to conduct
operations with both traditional grapnels and an ROV, this would allow
grapnels to be used outside of the ROVs operating range.
From a redundancy point of view it would also be advantageous to have grapnels
onboard in case of a ROV fault.
\end_layout \end_layout
\begin_layout Section \begin_layout Section
@ -400,23 +736,20 @@ Interaction with Ship
\end_layout \end_layout
\begin_layout Subsubsection \begin_layout Subsubsection
Network Architecture Network Connection
\begin_inset CommandInset label
LatexCommand label
name "sec:Network-Architecture"
\end_inset
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
\begin_inset Note Comment
status open
\begin_layout Plain Layout
In designing a distributed cable repair environment across a depot and ship In designing a distributed cable repair environment across a depot and ship
where digitalisation is a key design parameter, a secure and flexible network where digitalisation is a key design parameter, a secure and flexible network
layout is critical. layout is critical.
\end_layout \end_layout
\begin_layout Standard \begin_layout Plain Layout
The final environment will likely consist of between 2 and 3 networked sites The final environment will likely consist of between 2 and 3 networked sites
depending on the physical layout of the depot, some of these sites should depending on the physical layout of the depot, some of these sites should
have bi-directional communications with the others. have bi-directional communications with the others.
@ -429,7 +762,7 @@ The final environment will likely consist of between 2 and 3 networked sites
defining who else on the network can be communicated with. defining who else on the network can be communicated with.
\end_layout \end_layout
\begin_layout Standard \begin_layout Plain Layout
The structure of the network designed for the separate leisure facilities The structure of the network designed for the separate leisure facilities
will depend upon it's location compared to the main depot. will depend upon it's location compared to the main depot.
If the leisure facilities are directly co-located with the main depot then If the leisure facilities are directly co-located with the main depot then
@ -438,6 +771,11 @@ The structure of the network designed for the separate leisure facilities
connection would be preferred for speed and stability. connection would be preferred for speed and stability.
\end_layout \end_layout
\end_inset
\end_layout
\begin_layout Section \begin_layout Section
Digitalisation Digitalisation
\end_layout \end_layout
@ -450,10 +788,14 @@ The concept of digitalisation has a somewhat broad definition, sometimes
\end_layout \end_layout
\begin_layout Quote \begin_layout Quote
\emph on
The use of digital technologies to change a business model and provide new The use of digital technologies to change a business model and provide new
revenue and value-producing opportunities; it is the process of moving revenue and value-producing opportunities; it is the process of moving
to a digital business. to a digital business.
\emph default
\begin_inset CommandInset citation \begin_inset CommandInset citation
LatexCommand cite LatexCommand cite
key "gartner-digitalization" key "gartner-digitalization"
@ -475,17 +817,15 @@ Smart Ship
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
As included in the discussion of the network layout, there will be server Autonomous piloting and dynamic positioning are computationally expensive
computation capabilities on the ship. and will likely require server computation capabilities on the ship.
Through the use of virtualisation, this hardware could be used both for Through the use of virtualisation, this hardware could be used both for
network services and additional computation. these applications, network services and additional computation.
These capabilities could be utilised for fields including AI and machine
learning.
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
Combining bi-directional communication between ship and depot with local Combining bi-directional communication between ship and depot with local
computation, mission coordination and could be made more efficient. computation, mission coordination could be made more efficient.
Simple implementations could include live mission details being passed Simple implementations could include live mission details being passed
from depot-to-ship such as fault locations and equipment requirements and from depot-to-ship such as fault locations and equipment requirements and
live, live,
@ -547,6 +887,301 @@ name "sec:Solar-Power-Estimations"
\end_inset \end_inset
\end_layout
\begin_layout Standard
From the fleet of current cable laying and repair ships the following average
measurements were taken,
\end_layout
\begin_layout Standard
\noindent
\align center
\begin_inset Tabular
<lyxtabular version="3" rows="3" columns="2">
<features tabularvalignment="middle">
<column alignment="center" valignment="top">
<column alignment="center" valignment="top">
<row>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Average Width
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
116.5 m
\end_layout
\end_inset
</cell>
</row>
<row>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Average Length
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
20.53 m
\end_layout
\end_inset
</cell>
</row>
<row>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Average Sum Propulsion Power
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
9,111.84 kW
\end_layout
\end_inset
</cell>
</row>
</lyxtabular>
\end_inset
\end_layout
\begin_layout Standard
A deck area was calculated using the rectangle formed by this average width
and length, 2391.75
\begin_inset Formula $m^{2}$
\end_inset
, this is an over-estimation as boat footprints are not rectangular.
50% of this deck was used to estimate power generation, 2391.75
\begin_inset Formula $m^{2}$
\end_inset
, while likely not feasible on typical industrial boat designs a theoretical
pure solar-powered vessel would require high coverage.
\end_layout
\begin_layout Standard
For estimation purposes, the power generation profile of the investigated
solar panels was that of max power output for 8 hours a day.
This is far from the actual profile but will provide reasonable numbers
for these purposes, it will be an overestimation of the potential power
output.
\end_layout
\begin_layout Standard
Finally the vessel is assumed to be operate continuously at 75% of max power
draw, this in order to average the periods with which the vessel is stationary
and when it is operating at full power.
\end_layout
\begin_layout Standard
Using these premises, the percentage of required power being generated by
the panels can be roughly estimated by the following equation,
\end_layout
\begin_layout Standard
\begin_inset Formula
\[
P_{\%}=\frac{A_{deck}\bullet50\%}{A_{panel}}\bullet\frac{P_{max\:panel}\bullet33\%}{P_{max\:vessel}\bullet70\%}
\]
\end_inset
\end_layout
\begin_layout Standard
Using this, the following panels provided the following percentage of required
power using the rated dimensions and
\begin_inset Formula $P_{max}$
\end_inset
from their respective datasheets,
\end_layout
\begin_layout Standard
\noindent
\align center
\begin_inset Tabular
<lyxtabular version="3" rows="5" columns="3">
<features tabularvalignment="middle">
<column alignment="center" valignment="top">
<column alignment="center" valignment="top">
<column alignment="center" valignment="top">
<row>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Make
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Model
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Required Power %
\end_layout
\end_inset
</cell>
</row>
<row>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
CMPower
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
CMP24110SR
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
1.15
\end_layout
\end_inset
</cell>
</row>
<row>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
CMPower
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
CMP24175SR
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
1.24
\end_layout
\end_inset
</cell>
</row>
<row>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Panasonic
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
VBHN340SJ53
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
1.27
\end_layout
\end_inset
</cell>
</row>
<row>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
Sunpower Maxeon 5
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
SPR-MAX5-450-COM
\end_layout
\end_inset
</cell>
<cell alignment="center" valignment="top" topline="true" bottomline="true" leftline="true" rightline="true" usebox="none">
\begin_inset Text
\begin_layout Plain Layout
1.41
\end_layout
\end_inset
</cell>
</row>
</lyxtabular>
\end_inset
\end_layout \end_layout
\begin_layout Section \begin_layout Section
@ -554,6 +1189,10 @@ Nuclear Extract
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
\begin_inset Note Comment
status open
\begin_layout Plain Layout
Nuclear energy is a proven technology for vessels of this size however there Nuclear energy is a proven technology for vessels of this size however there
are many caveats that effectively discount it from applications in this are many caveats that effectively discount it from applications in this
project. project.
@ -564,5 +1203,10 @@ Nuclear energy is a proven technology for vessels of this size however there
limited to military vessels. limited to military vessels.
\end_layout \end_layout
\end_inset
\end_layout
\end_body \end_body
\end_document \end_document